The Ligne Nouvelle Provence Côte d’Azur (LNPCA) project aims to

develop, improve and make more reliable the rail service between Marseille, Toulon and Nice.

The phases 1 & 2 project of modernisation of the existing railway line will allow the increase in the number of daily trains (TER) and the implementation of 3 “Metropolitan Regional Express Services” known as SERM around the urban areas of Aix-Marseille, Toulon and Nice.

It also allows the development of cross-border links with Italy but also facilitates long-distance travel by train from Spain or Northern Europe to Italy.

The objectives of phases 1&2

More trains within the 3 metropolises of Aix-Marseille, Toulon and Nice and the Côte d'Azur and between them

Time savings and fewer delays on journeys for more than 200 daily trains on the Marseille-Nice axis

Better coverage of the territories

Efficient intermodality

New or modernised stations, comfortable and redesigned public spaces for greater comfort and safety

Developing the capacity of the line for rail freight transport

The project aims to strongly encourage the modal shift from private cars to trains and contribute to the decarbonisation of mobility in line with the carbon neutrality objectives for 2050.

Benefits for you

At the local, metropolitan and regional level

Thanks to improvements on the existing network, the TER service will be able to increase from 2 to 3.5 non-timetabled TERs / hour / direction (current situation) to 4 to 6 TERs / hour / direction with an attractive timetable around the Metropolises of Aix-Marseille, Toulon, Nice and the Côte d’Azur.

At the national level

They will allow facilitating continuity and improving the quality of service of national and inter-regional lines beyond Marseille towards the Var and the Côte d’Azur, thanks in particular to the underground crossing of Marseille which provides a significant time saving of 15 to 20 minutes.

At the level of European interest

With the creation of an Azurean shuttle between Cannes and Ventimiglia on the one hand and the elimination of the bottleneck at Marseille Saint-Charles station at the intersection of the European transport corridors “North Sea-Rhine-Mediterranean” and “Mediterranean”, the project will allow before 2035 to:
  • densify cross-border links with Italy
  • facilitate the extension beyond Marseille of international lines from Spain to Italy

The following phases (phases 3 and 4 which provide for sections of new line) should allow densifying and accelerating links between the regional metropolises around Marseille, Toulon and Nice and contribute to building a high-performance railway axis on the Mediterranean arc between Barcelona and Genoa.

The LNPCA works

Phases 1&2 of the LNPCA project include 22 operations spread between Marseille and Nice.

The various works will allow increasing the number of trains in circulation but also reducing the consequences of incidents on the line which currently cause delays and even train cancellations.

They will also allow the creation of new, modernised, comfortable, multimodal stations located at the heart of developing neighbourhoods driven by the local authorities partnering the project. These stations, easily accessible by bus, metro, tram, bicycle or on foot, will effectively contribute to the modal shift from car to train and will fit harmoniously into their urban environment.

The LNPCA project complements the significant modernisation effort of the coastal line carried out through the Haute-Performance Marseille-Vintimille (HPMV) project of new European signalling allowing to facilitate the movement of trains from one country to another.

Schedule

Cost and financing of the project

The project presents an exemplary collaborative financing model, which allows all local stakeholders to be associated with an ambitious project. Alongside the State and the European Union, 11 local authorities have united within the Société de la Ligne Nouvelle Provence Côte d’Azur to contribute financially to the success of the project by guaranteeing compliance with territorial constraints and the technical, financial and time framework of its implementation.

The complete financing protocol for the phases 1 & 2 project, signed by all partners on 21 December 2021, specifies the financing intentions of each co-financer. The cost of the phases 1&2 project is in the order of 3,838M€ at the economic conditions of July 2020 (an economic condition called “constant” does not take into account costs related to inflation).

History

Governance

The main Governance bodies of the LNPCA Project are:

The steering committee (COPIL)

  • Chaired by the Prefect of the Sud region and by the President of the Sud Region and composed of elected representatives of the partner local authorities
  • Ensures the steering and validates the major orientations and decisions of the project. It relies on:
The technical committee (COTECH)
  • Chaired by an Inspector General of the Environment and Sustainable Development and composed of representatives of the partner local authorities
  • Prepares the COPIL meetings and informs partners on technical aspects

The commitment, monitoring and risk committee (CESR)

  • Co-chaired by the President of the SLNPCA and a representative of the State.
  • Formally informs on risks, financial commitments and strategic contracts

The metropolitan coordination committees (COCOMET)

  • Chaired by the relevant Metropolises.
  • Coordinate the LNPCA project with urban and territorial projects, and relay local specificities